Sunday, May 27, 2018

Late May Update

Hi All,
Things are still moving along with the house. Since my last post we've gotten a roof on. Yeehaa! Power and water is into the house, all the wiring and plumbing is installed, just the wires and pex, not all the fixtures. Almost all the siding is up, including the bark we put on the gable on the front of the house.

It's already getting hot here, it's in the 90's. The forecast for the first five days of June is 100+.  Hopefully we'll have air conditioning soon and be able to work inside.

Here are some pictures to show you how things are looking...

Grady and I hooking up power to the house

Ain't it pretty!?

Cold water manifold so we can shut water off to individual rooms

The guest bathtub is installed and plumbed

Installed a ceiling fan to help cool off the inside
The roof is on! The roof is on! And Susan doing her pyromaniac thing. Scrap lumber doesn't hang around long.

Bark siding going up

Exactly the look we were going for (there will be a porch roof and the siding will be painted)


That's it for now. Take care.
Brian