For most of the year we've gone back and forth on when to build our garage / shop. Do it now or put it off until next year? We decided to do it now, we need the storage and work space. So here are a few pictures of how it progressed.

Last Monday at 8:30 AM and the first wall is up

By Tuesday afternoon it is framed, has siding and a roof

Friday spray in foam insulation was done

Besides the garage we did a few things in the house...

The mantle is finally up

We liked the interior brick wall so much we decided to turn the corner and do another

That's all for now. Take care.

Brian

Sunday, August 5, 2018

Progress Report

Hi all,
It's past time for me to post on our progress so this should get you caught up.

The kitchen cabinets are all in as well as the appliances. We have a fully functional kitchen! Our countertops are plywood until we figure out what we want. The mudroom is finished and things are starting to take up residence there. The powder room has a door, toilet and a sink, not to mention about half of its walls.  The guest bathroom has a tub / shower with tile. The great room has a ceiling fan, as does the kitchen and the master bedroom. All the ceilings are panted. The back porch (facing the pond) has lights and ceiling fans.

Susan and I have done all the tile work. I run the tile saw and she does all the hard work of putting it down (or up in the case of the guest bath). There is tile around the tub in the guest bath, on the floor of the powder room and the floor of the mudroom. All the rest of the floors are bare concrete at the moment.

On to the pictures...

We moved a bed into the bedroom last weekend so we could start sleeping in the house.

Ceiling fan in the kitchen and great room

Tub / Shower in the guest bathroom

Kitchen appliances are in!

But it is still a construction zone.

The mud room

Powder room with walls from a barn we tore down in LA (Lower Alabama)
From across the lake at night

That's all for now. Take care.

Brian

Tuesday, June 26, 2018

We have air conditioning!

Hi All!
This post will be short and sweet. The big news today is we have air conditioning! We sure do need it. Other recent developments are the kitchen cabinets are installed (they are beautiful) and the porch roofs are going on.

Feels like 116, this is why we needed air conditioning
Kitchen cabinets are in and look fantastic, clear coat going on now
Porch roof should be done by the end of the week
The view of the house from across the lake this morning
That's all for now.
Take care.

Brian

Sunday, June 10, 2018

Moving Along

Hi All,
I'm trying to do better about posting a bit more often. This time there is a good bit of progress in a short timeframe. Two things before I get to the house.

There is a private road that runs along the eastern boundary of our property. Since we bought the property we have been trying to get the county to take it over and maintain it. There are five landowners that had to agree to deed some right of way to the county in order to make it happen. Between getting a survey and getting all the effected landowners to have documents signed and notarized it has taken every bit of six months to get this done. Working with the county has been by far the easiest part of the ordeal. On Tuesday, June 5th, Susan and I attended the Rusk County Commissioners Court and saw all our work come to fruition. Welcome to County Road (CR) 1114 D! Once the East Texas 911 office gives us a street number we'll be official and be able to change our address to our final one.

On the way to Commissioners Court we got some much needed rain. What we didn't need was to be quite so close to a lightening strike, about 100 feet by my estimation, Wow! It shook us both up a bit. I'd be very happy to never again be close enough to see the orange ball of flame that is at the end of those white streaks in the sky.

On to the house. All the siding is up and it's 90% painted. The HVAC ducts are all in. This was by far the worst job of any Susan and I have done on the house. The spray foam insulation is in and where there is going to be drywall, it has been hung. So here are the pictures...

Clapboard siding for the back side gable end. From left to right; Grady, Brian, Amber (Scott's daughter) and Scott.

Spraying Kilz as the first layer
Finished with the Kilz
After the Kilz, brown paint. Of course it has a much fancier name than "brown".

The final coat and we're done, I told you we weren't going to leave it yellow.
Spray foan insulation is in. The roof part isn't finished in this picture.
The drywall is up. This is the master closet.
That's all for now. Take care!
Brian

Sunday, May 27, 2018

Late May Update

Hi All,
Things are still moving along with the house. Since my last post we've gotten a roof on. Yeehaa! Power and water is into the house, all the wiring and plumbing is installed, just the wires and pex, not all the fixtures. Almost all the siding is up, including the bark we put on the gable on the front of the house.

It's already getting hot here, it's in the 90's. The forecast for the first five days of June is 100+.  Hopefully we'll have air conditioning soon and be able to work inside.

Here are some pictures to show you how things are looking...

Grady and I hooking up power to the house

Ain't it pretty!?

Cold water manifold so we can shut water off to individual rooms

The guest bathtub is installed and plumbed

Installed a ceiling fan to help cool off the inside
The roof is on! The roof is on! And Susan doing her pyromaniac thing. Scrap lumber doesn't hang around long.

Bark siding going up

Exactly the look we were going for (there will be a porch roof and the siding will be painted)


That's it for now. Take care.
Brian

Monday, April 30, 2018

Wow!

It's been an entire  month since I last posted. Talk about being a slacker! Trust me, we haven't been slacking off on working, just posting. Besides the work on the house we've put up a rain water catching system on the barn, harvested some veggies out of the garden, just about completed the hen house and changed out several hydraulic hoses on the skid steer, not to mention pulling the hydraulic pump off the backhoe.

Since our last post a fair bit has been accomplished on the house. Last week we had some friends take vacation time to come help us work on the house. It was great to see Jay and Carol again and their help was very much appreciated. Jay spent most of his time up in the rafters installing can lights or running wire while Carol worked on clear coating our doors and windows. Thanks you two! Only two disappointments with their visit. They didn't stay long enough and we didn't get any pictures with them. How did that happen?

But what you really want is to see pictures, so here they are...

As our OSHA safety officer, Susan is falling down on the job. A ladder on scaffolding in the rain. 

Ricardo, our stonemason, finished our "accent" brick wall.
The heater / air handler is in
The front of the house has some siding. It won't be staying yellow.
The deck, which faces the pond
The great room with fireplace and two sets of french doors on to the deck
Susan up in the rafters cutting a hole for an A/C boot

Electrical wiring is coming along

A wood stove we bought, pretty much where it's going to sit.

Some of Jay's handy work in the rafters
Some new neighbors moved in down the road. Their oldest son did a little fishing in our pond.

Hopefully tomorrow some roofers will show up and start putting metal on our roof. I hope, I hope, I hope!

That's all for now. Take care!

Brian

Wednesday, March 28, 2018

It's spring in East Texas

Hi All,
Time for an update on progress and such.

All the exterior sheeting is up
Duncan doing his inspection as the wrapping goes on

The triple window on the left is in our bedroom. It is six feet tall and nine feet wide. It is awesome! 
Just before the rain came again about half the windows were in. And rain it did. In the last 20 hours or so we've gotten almost three inches of rain.

All work and no play makes Jack (and Susan and Brian) a dull boy / girl. So we took a day off to go to the Dallas Arboreteum for Dallas Blooms! with my brother and sister-in-law.

Half a million bulbs in bloom and perfect weather
 On St Patricks day we went to dinner with friends at a mutual friend's restaurant in Mount Vernon (Texas), The Chophouse on Bankhead. Yum!

Back at home we walked around close to the homesite and marked all the Dogwood trees so as to not accidently take them out when we get around to clearing some more underbrush. Several will be seen from the aforementioned bedroom windows.

Much easier to see in real life. Come see for yourself! 


That's all for now. Take care.

Brian